The goal: Make a bridge that withstands the maximum load before it fails.  ASCE provided a table for event entertainment for the participants and families, toothpick and starburst structure creating with loads, and a shake table to test them with.  Also we constructed a large cable stay bridge for the students to interact with throughout the day.

11